Case Studies | Prismecs
May 02, 2025
Crete, Greece’s largest island, has long faced energy reliability issues due to its isolation from the mainland grid and heavy reliance on diesel-powered plants.
Accelerating Taiwan’s Energy Transition - LM2500XPRESS
Add 180 MW of fast, flexible generation capacity to Taiwan’s grid.
Powering Oman’s Industrial Heart – TM2500 Project
Provide continuous 24/7 power to Duqm city, port, and industrial facilities ahead of the national gr...