Modular fast-start plant delivered on a ten-month schedule with low emissions and a hydrogen-ready design.
Miaoli, Taiwan
Prismecs helped fast-track the installation of six aeroderivative gas turbines, which added 180 MW of flexible, low-emission capacity to Taiwan's power grid. A modular design with high factory preassembly enabled rapid installation and cold start to full load in about eight minutes, supporting renewable backup and urgent grid needs.
Our scope encompassed specialized port logistics, site readiness, turbine grid tie-ins, and regulatory navigation. The plant incorporates Dry Low Emissions technology and hydrogen-ready systems to meet strict air quality goals today and support deeper decarbonization over time.
We delivered rapid deployment, technical precision, and full compliance under a compressed schedule.
Discover how a ten-month build successfully met tight timelines, strengthened energy resilience, and enabled faster renewable integration with fast-start turbines and a hydrogen-ready design.
Need to bring capacity online fast, stabilize operations, or reduce risk on complex sites? Prismecs delivers disciplined execution for power projects.
Custom service package for your site
Turbine and balance of plant parts support
Quick and reliable mobilization