DC coupled storage added to an existing 4 MW PV plant with coordinated controls, protection design, and complete testing through commissioning.
Florida, USA
Prismecs delivered a DC-coupled retrofit that integrated a 16 MWh battery system with an existing 4 MW solar array. The upgrade enhances usable energy and streamlines operations by integrating PV and storage as a single system.
Our scope encompassed the control philosophy for a coordinated BESS, inverter, and string optimizers, including engineering the BESS connection at the inverter DC link, cable protection design, a DC arc-flash study for PV and BESS, system testing, and support throughout procurement, construction, startup, and commissioning.
We integrated storage at the DC link to maximize capture and simplify operations.
Need to bring capacity online fast, stabilize operations, or reduce risk on complex sites? Prismecs delivers disciplined execution for power projects.
Custom service package for your site
Turbine and balance of plant parts support
Quick and reliable mobilization