629 MW COMBINED-CYCLE OWNER'S ENGINEER SUPPORT
Reserve capacity delivered on a six-month fast track with a new 220 kV interconnection and full
Barcarena, Brazil
629 MW COMBINED-CYCLE OWNER'S ENGINEER SUPPORT
Prismecs served as Owner's Engineer at CELBA 2, a 629 MW LNG-to-power combined-cycle plant in Barcarena, northern Brazil. The engagement provided independent oversight through final commissioning, start-up, and stabilization, helping the plant reach combined-cycle base load on the day of initial start-up and move into commercial operation. Work spanned over gas turbine, steam turbine, HRSG, electrical systems, controls, and balance of plant. Our team witnessed repairs and inspections, tracked punch-list and warranty items, and supported synchronization and load stabilization. We also guided the handover from contractor-led commissioning to long-term O&M while coordinating across multiple OEMs and contractors.
SERVICES PROVIDED
We delivered independent technical oversight from commissioning to commercial operation, helping the plant start up safely and run steadily.
- Daily field walkdowns and control-room monitoring across GT, ST, HRSG, and BOP
- Witnessed inspections and repairs, with root-cause and OEM recommendation reviews
- Start-up, synchronization, and load stabilization support through COD
- Punch-list, warranty, and temporary installation tracking with clear ownership
- Daily supervisory reporting and O&M readiness support for a smooth handover
Swift Development of Switzerland’s Emergency Power
A six-month sprint delivered reserve capacity on time. The team overcame tight site constraints, a new 220 kV interconnection, and residential noise limits with a twenty-meter wall.
Talk to our Project Expert
Need to protect availability, meet safety standards, or secure critical parts? Prismecs delivers fast, compliant support for turbine operations and power projects.
- Custom service package for your sit
- Turbine and balance of plant parts support
- Quick and reliable mobilization