Storage sized to capture PV clipping losses and increase usable energy from an existing solar plant.
New York, USA
Prismecs delivered a 28 MWh BESS with a 7 MW interface to harvest overload loss from the site's PV array. We built a PVsyst model to quantify clipping, sized the battery accordingly, and guided design review and vendor selection through to startup and commissioning.
We transformed clipped PV into dispatchable energy through data-driven design and disciplined execution.
Need to add storage, improve yield, or de-risk integration? Prismecs delivers disciplined execution for power and BESS projects.
Custom service package for your site
Turbine and balance of plant parts support
Quick and reliable mobilization